Chemical Process Safety (PSM/RMP)

New Edition of Pamphlet 6, Piping Systems for Dry Chlorine, now AVAILABLE (FREE Download)

Revision 16 of this pamphlet includes the addition of a section on fully-lined valves (4.1.9), a more robust section on liquid expansion chambers (5.5), recommendations on plastic pipe selections and discussion on gas permeability under vacuum (9), a caution on pneumatic testing (11.2.2), updated guidance on hydrostatic testing (appendix A, 2.3.1), and addition of a […]

PHA’s and “previous incidents”

One area that is often overlooked or not applied during process hazards analysis (PHA) is a review of previous incidents.  This is often not done as the process has no reported incidents in the past five years.  We can discuss/challenge that “phenomenon” in a later posting, but I wanted to offer this bit of advice…

Pressure Vessel Accident Rates

With the release of the CSB accident report involving the catastrophic failure of an ASME pressure vessel and me posting it this afternoon, I am already getting e-mails (5 and counting within the first two hours) claiming the incident is “1 in a million” and that I am scaring people for no sound reason.  Really?

CATASTROPHIC FAILURE of ASME Pressure Vessel (Video and CSB Investigation)

This accident occurred December 7, 2009, with a violent rupture of an ASME pressure vessel.  The video contains an animation which depicts the stress corrosion cracking (SCC) that accumulated over time in the walls of a pressure vessel where synthetic quartz crystals were manufactured under extremely high pressures and temperatures.  The incident had many failures

First (1st) Public Review of Standard BSR/IIAR 4-201x, Installation of Closed-Circuit Ammonia Mechanical Refrigeration Systems

The first (1st) public review of draft standard IIAR 4-201x, Installation of Closed-Circuit Ammonia Mechanical Refrigerating Systems is now open. Substantive changes resulting from this public review will also be provided for comment in a future public review if necessary.  IIAR 4 specifies criteria for the installation of closed-circuit ammonia refrigeration systems. It presupposes that

“Temporary Operations” in Ammonia Refrigeration

How many process safety management systems for ammonia refrigeration have you seen that included “temporary operations”? There seems to be an industry-wide mind set that there are no “temporary operations” in ammonia refrigeration. Heck, even the largest ammonia refrigeration trade group states there are is no such thing as “temporary operations” in the ammonia refrigeration

Resubmitting an RMP

RMPs must be updated at least once every five (5) years.  You must fully update your RMP for resubmission sooner than the five-year anniversary date, if any of the changes specified below occur [as specified in 40 CFR 68.190(b)]. If a change alters the Program Level that applies to any covered process, the RMP must

BSEE Releases Panel Investigation Report into Fire and Explosion on Gulf of Mexico Platform (FATAL HOTWORK ACCIDENT)

The Bureau of Safety and Environmental Enforcement (BSEE) has released the panel investigation report into the November 16, 2012 HOTWORK explosion and fire that occurred on an offshore platform. The explosion and fire resulted in the tragic deaths of three (3) workers, serious injuries to others, and the discharge of pollutants into the Gulf of

Scroll to Top