Safety Info Posts

Inspections vs Audits

The words “audits” and “inspections” often get used as if they are the same thing – THEY ARE NOT the same.  I always like to say we inspect “things,” and we audit those inspections. Much like my previous post earlier this month, explaining the difference between “examinations” and “inspections” as used in ASME B31 series;

[My Safety] Thought of the Week… the SIF approach

If your team is focused on an event’s probability or likelihood, you’re NOT doing SIF! The Serious Injuries and Fatalities (SIF) model is intended to IDENTIFY events that have opportunities to cause life-altering injuries and death. And yes, most of these will (hopefully) have LOW frequencies/probabilities. So, to justify NOT responding to these LOW frequency

Safety Thought of the Week… Barrier/Controls/Safeguards Management

The purpose of barrier[/controls/safeguards] management is to make the kind of implicit controls explicit:  to be clear about exactly what controls are relied on to prevent incidents, to understand their characteristics, to have an understanding of how reliable they can be expected to be, and to know what needs to be done to ensure the

EPA RMP citations @ chlorine, bleach, and hydrochloric acid facility (Cl2, H2, HCL & $264K w/ $363K SEP)

Respondent operated a facility (the “Facility”) to manufacture chlorine, bleach, and hydrochloric acid. Respondent produced, used, or stored more than 2,500 pounds of chlorine at the Facility and was subject to the requirements of CAA § 112(r)(7). Respondent produced, used, or stored hydrogen at the Facility and was subject to the requirements of CAA §

Differences between a H-2 and H-3 occupancy

In terms of Fire and Building Codes, we have five (5) recognized areas associated with handling hazardous materials. We refer to these high-hazard areas/occupancies as “Group H”.  High-hazard Group H occupancy includes, among others, the use of a building or structure, or a portion thereof, that involves the manufacturing, processing, generation or storage of materials

“Normal venting” for aboveground tanks

During a recent design review, we encountered some questionable “normal breathing” designs. I have always used the simplest of tests to ensure the tank has ADEQUATE venting during filling and emptying. Although OSHA allows the designer to use API 2000 (1968) or “other accepted standards,” the simplest test is that the VENTING capability MUST be

Scroll to Top