Safety Info Posts

2016 Emergency Response Guide (ERG) now available

The much anticipated 2016 ERG (well it was for HAZMAT folks) is now available for download in Portable Document Format (pdf). The file size is 12700 KB. ERG 2016 – English GRE 2016 – Spanish Here is the link to the APP (https://itunes.apple.com/us/app/erg-2016/id592158838?mt=8) See below for changes from the 2012 edition…  

Intrinsically SAFE instrumentation MATTERS (digital pressure gauge caused explosion that severed arm)

UPDATE 10/18/2016 – Hawaii Occupational Safety and Health Office reduced the number of violations cited from 15 to nine and lowering fines from $115,500 to $69,300.  About a month after the blast, the Honolulu Fire Department said its investigation determined the explosion was likely caused by a digital pressure gauge in the tank that produced an

Does “emergency services” mean “rescue service” in OSHA’s new PRCS standard for Construction?

I have written several times now about OSHA’s new Construction Standard for Permit-Required Confined Spaces and how this new standard clarifies several aspects regarding the General Industry Standard 1910.146. But one requirement I continue to get push back on is the fact that ENTRY-STYLE Rescue is REQUIRED for ALL “permitted entires” in both Construction and

OSHA issues PRCS (Construction) Citations @ WWTP (PRCS, Pressure Testing & $85K)

These citations are the FIRST OSHA citations using 1926.1201-1213, OSHA’s confined space in constructionOSHA’s confined space in construction standard.  It is IMPORTANT to point out these citations involved work at a waste-water treatment plant (WWTP) which is normally a workplace that would fall under OSHA’s GENERAL INDUSTRY standards; however, the work being done INSIDE the 54″ pipe

Even in “complex energy isolations” we MUST include specific procedures to VERIFY ZERO ENERGY of EACH isolation point (OSHRC)

This was a significant decision by the OSHRC as it answered the debate… do isolation plans associated with complex energy isolations need to include the means to verify Zero Energy State (ZES) for each isolated source?  There answer… YES, and it MUST be DOCUMENTED in the isolation plan/worksheet.  The refinery’s arguments that the means to

Scroll to Top