Gate Valves and their installation in “relief path”

Most of us have seen a gate valve installed in piping, and 99% of the time, we want to see the valve handle in the VERTICAL-UPWARD position. However, when we need to install an “intervening valve” in the relief path, which ASME allows, we may/should see the valve handle(s) in the Horizontal or below Horizontal […]

ASME’s NEW Section XIII – Dual PRD Systems

ASME has allowed dual PRD systems ever since I started in process safety back in 1993. These systems usually have a Rupture Disc (RD) BEFORE the Pressure Safety Valve (PSV). This is usually done to protect the more expensive and more complicated PSV from the corrosive process gases. Although I never managed a PR system

ASME’s NEW Section XIII – Rules for Overpressure Protection – STOP VALVES USED IN PRESSURE RELIEF SYSTEMS

For decades, we used Appendix M-5 in Section VIII as our design basis for having intervening/stop valves before and/or after a Pressure Relief Device (PRD).  But in 2021 (amid the global pandemic), ASME published its new Section XIII, Rules for Overpressure Protection.  We now use Appendix B of this new ASME section when we have a design

Not all flanges and threaded joints must be “visually examined” unless…

It is true that not all flanges and threaded joints have to be visually examined. However, this exemption is seriously limited. (4) a sufficient number of threaded, bolted, and other mechanical joints selected at random to satisfy the examiner that they conform to the applicable requirements of para. 335. Here is the qualifier…

Not recognizing “change of service” for Pressure Vessel(s) leads to catastrophic failure (Brittle Fracture Failure)

On September 19, 2002, Employee #1 was painting one (1) of six (6) tanks containing carbon dioxide when three (3) of them suddenly exploded. He was killed. The tanks were originally built as railroad tank cars for liquefied petroleum gas and they were not designed to store carbon dioxide.

One of the questions I got after the CSB Update on the PV failure in KY was…

“Why did they have a Rupture Disc and a Relief Valve together?” As I alluded to in my post regarding CBS’s update, this arrangement is fairly common but comes with some very SPECIFIC requirements. These requirements can be found in: But the top four (4) requirements, we as safety engineers should be looking for in

The National Board on “intervening valves” in the PRV path (Car Seal)

It has grown tiresome, but it remains a teachable moment, to debate “engineers” who want part of ASME/NBIC to be the gospel and other parts not so much. The ammonia refrigeration industry just can’t seem to grasp the critical need in their “Common PRV Header Design” v.s. having more “holes in the roof” (as they